PET and technical polymers manufacturing company with an 180,000 m2 production plant

Work carried out

  • Draft and investment analysis to refurbish the Fire Protection System installation and compliance process.
  • Isometric drawing and measurements for load origin and shipping point modification in T-23 and T-24 silos.
  • Isometric drawing of the refrigeration installation and its expansion.