Large multinational company in the packaging and technical plastics sector with a production warehouse of 12,800 m2

Work carried out

  • FPS project in a plastic injection plant.
  • Project for adaptation to RD 2267/2004 and CTE-DB SI of the office block and other non-zoned units. Environmental permit and FPS projects for the 600 m2 raw materials warehouse.
    • FPS update project.
    • Management, final certification, and legalisation.
  • Projects for a local permit for the temporary use of a plot with an estimated surface of 2000 m2.
  • Certification of the replacement of curtains by FR doors in production warehouse.
  • Preparation of Technical Report for two centralised warehouses.
  • Declaration of conformity of a complex consisting of an injection moulding machine and a robot.