Large multinational company in the packaging and technical plastics sector with a production warehouse of 12,800 m2
Work carried out
FPS project in a plastic injection plant.
Project for adaptation to RD 2267/2004 and CTE-DB SI of the office block and other non-zoned units. Environmental permit and FPS projects for the 600 m2 raw materials warehouse.
FPS update project.
Management, final certification, and legalisation.
Projects for a local permit for the temporary use of a plot with an estimated surface of 2000 m2.
Certification of the replacement of curtains by FR doors in production warehouse.
Preparation of Technical Report for two centralised warehouses.
Declaration of conformity of a complex consisting of an injection moulding machine and a robot.